|
The following Guidelines for Applicants Connecting Distributed Generation will provide those interested in connecting distributed generation with a detailed process and the requirements and specifications for connection. Please review these guidelines and the associated applications forms in full.

|
|
Residential micro-generation (microFIT) Installation Standards
The following two standards have been produced by Halton Hills Hydro to assist those installing metering and utility disconnect switches for micro-generation at residential locations. These standards shall be followed by those installing metering and utility disconnect switches.
Residential Overhead Installation micro-generation (parallel connection), 25-101
Residential Underground Installation micro-generation (parallel connection), 25U-221r2
If you are interested in connecting a renewable generation project to Halton Hills Hydro's distribution system please contact us via email at generation@haltonhillshydro.com or by phone at 519-853-3700 Ext. 222 or 905-453-2222 Ext. 222 for more information.
Also, visit the Ontario Power Authority and the Ontario Energy Board for additional microFIT and FIT related information. |