Skip to content

Guidelines / Applications

The following Guidelines for Applicants Connecting Distributed Generation will provide those interested in connecting distributed generation with a detailed process and the requirements and specifications for connection. Please review these guidelines and the associated applications forms in full.

Residential micro-generation (microFIT) Installation Standards

The following two standards have been produced by Halton Hills Hydro to assist those installing metering and utility disconnect switches for micro-generation at residential locations. These standards shall be followed by those installing metering and utility disconnect switches.

If you are interested in connecting a renewable generation project to Halton Hills Hydro’s distribution system please contact us via email at [email protected] or by phone at 519-853-3700 Ext. 222 or 905-453-2222 Ext. 222 for more information.

Also, visit the Independent Electricity System Operator and the Ontario Energy Board for additional microFIT and FIT related information.

Close